摘要 |
In a process and an apparatus for the stabilization or repair of damaged roads, the road surface is milled off and the material is crushed on the site. The surface material so obtained is added with binders of cement, cement sludge, water and/or bitumen emulsion and/or pre-mixed addition material and/or mineral components of the required grain size and amount, and the material so prepared is again built into the road surface.
|