摘要 |
PROBLEM TO BE SOLVED: To provide an elevator operation control device in which the data according to the generating condition of hall calls are collected, the accuracy of predicting the generation of hall calls is improved, and the memory necessary for prediction is reduced. SOLUTION: An operation control device 2 is provided with learning means 22, 24 to learn the hall call, hall call generation predicting means 25, 26 to predict the waiting time and the waiting floor based on the learned results, and an operating means to operate an elevator at the waiting time and at the waiting floor. The hall call generation predicting means variably changes the prediction time intervals to regard the same hall call according to the generating condition of the hall call based on the learned results. |