摘要 |
PROBLEM TO BE SOLVED: To carry out a process for filling the required specification of respective slabs efficiently by the surface imperfections remove facility of the slab cut-separated after continuous casting. SOLUTION: A picture format for tracking is carried out by the code indication of shabs existing on the position of a carrying truck and in respective yards in order to track and control the slabs individually. The slabs are received from a continuous casting facility at CCA yard station 1. A slab required a warmth keeping is moved to a temporary storage from CCB yard station 2 and central operation room station 6. The slab to be ground is moved from grinder stations 3, 4, 5 to a grinding device and carries out a surface grinding. The slab reverse turned after surface grinding indicates a reverse turn truck indication 16 as well as a code. When the grinding of a back side is carried out, the slab is ground by a front surface grinder again. An inspection and weighing of the slab after finishing grinding are carried out and the slab is shipped out after deburr grinding from a front surface inspection and weighing station 7. |