摘要 |
<p>PROBLEM TO BE SOLVED: To provide a scaffold for construction works which can be erected at a low cost, allows simultaneous execution of the interior/exterior works and the external structural works, and permits checking the progress situation of the finishing process. SOLUTION: A mobile scaffold concerned comprises a frame 1 formed by assembling approx. vertially different lengths of pipe material which are standardized, a passage 2 formed approx. horizontally within the frame 1, a dolly 3 installed at the bottom of the frame 1, a plurality of wheels 4 attached to the dolly 3, and two rails 5 on which the wheels 4 run. According to this configuration, the scaffold can be shortened, and it is possible to perform the construction works under simultaneous execution of carrying-in of architectural materials and the external structural works while the scaffold is moved, so that the scaffold can be embodied at a low cost and the construction term can be shortened.</p> |