摘要 |
PROBLEM TO BE SOLVED: To hardly cause clogging and to take prolonged maintenance intervals. SOLUTION: Garbage is fed into a crushing chamber 210 from a feeding port 107, and upon turning on a power switch, a faucet is opened to cause water to flow. In this way, a screw 201 and a rotary blade 204 are rotated to transfer the garbage toward the right in order by the screw and are pressed against the front surface of a fixed blade 206. And the garbage that will enter a discharge port 207 of the fixed blade is cut by the rotary blade, and furthermore are crushed and discharged to a discharge chamber 211 with the flow of waste water. On the other hand, waste water is introduced to the side of a conduit 212 from a waste water path 106 formed between an inner cylinder 102 and an outer cylinder 101, and furthermore, is conducted to the discharge chamber from above it and is discharged to the side of a drain pipe 6 together with the crushed garbage discharged to the discharge chamber. |