摘要 |
<p>PROBLEM TO BE SOLVED: To reduce a service stop period due to the repairing, testing, and expansion of a power cable in a gas insulated switching device with a plurality of power cables. SOLUTION: In a gas insulated switching device including a cable unit with a plurality of cable heads 7a and 7b that are housed in a gas insulation container 8a being connected to a power cable 9a and a bus that is connected to the cable heads 7a and 7b and is housed in a gas insulation container, the gas insulation containers 8a and 8b of a cable head and the gas insulation container of the bus are connected via a separable gas insulation separation container 24, and the cable heads 7a and 7b and the bus are connected by separable conductors 27a, 27b, 28a, and 28b.</p> |