发明名称 RIVER ADMINISTRATION FACILITY OPERATION GUIDANCE SYSTEM
摘要 PROBLEM TO BE SOLVED: To efficiently retrieve respective water drainage facility operation rules in a drainage basin where branch drainage basins are mutually connected by drainage canals by classifying water rise phenomena in object areas by scales, and using a group of flood countermeasure DBs by drainage basin states which are generated corresponding to the phenomena. SOLUTION: Water level prediction simulation at a water-system main spot is carried out and the flood phenomena in an object area are evaluated by a drainage basin state classification part 5 and classified into, for example, a small-scale water rise, an intermediate-scale water rise, and a large-scale water rise. As the group 6 of flood countermeasure DBs by flood scales, operation rules corresponding to various water rise cases and classified by large-scale, intermediate-scale, and small-scale water rise DB parts 61-63. Based on the calculated prediction data and measurement data, rule DBs for placing respective water drainage facilities in operation are retrieved by a DB retrieval part 7 for the DBs to select a desired wide-area operation schedule plan. Then water level prediction simulation is performed again to select the most suitable schedule plan.
申请公布号 JPH1011150(A) 申请公布日期 1998.01.16
申请号 JP19960165585 申请日期 1996.06.26
申请人 HITACHI LTD 发明人 ITO HIROKI
分类号 E02B1/00;E03F1/00;G05D7/06;G06F19/00;G06Q10/00;G06Q50/00;G06Q50/10;G06Q50/26 主分类号 E02B1/00
代理机构 代理人
主权项
地址