发明名称 RAILWAY LOAD MANAGING SYSTEM
摘要 PROBLEM TO BE SOLVED: To improve the accuracy of estimation of substation load power value which changes in a time series manner, by using a mixed coupling type of neutral network which has an ability to recognize data changing in a time series manner. SOLUTION: The load electric energy P1 after passage of a specified time from the present time is estimated with a power estimation means 1 by means of a mixed coupling type of neutral network. Next, the combined weight coefficient within the mixed coupling type neutral network is studied by a study means 2, using the actual result value of the past load electric energy as a teacher signal. Then, a notch limit command judging means 6 judges the on/off of the notch limit command to a train by comparing the estimated load electric energy by a power estimating means 1 with the contract power with a power company, and outputs the result. Hereby, the estimation of the load electric energy of a substation can be performed with accuracy, and also the electric energy used can be maintained at or under the contact electric energy with the power company.
申请公布号 JPH09322403(A) 申请公布日期 1997.12.12
申请号 JP19960131543 申请日期 1996.05.27
申请人 WEST JAPAN RAILWAY CO;TOSHIBA CORP 发明人 SAKAMOTO TETSUO;HAYASHI MIEKO
分类号 H02J3/00;B60M3/00 主分类号 H02J3/00
代理机构 代理人
主权项
地址