摘要 |
PROBLEM TO BE SOLVED: To greatly reduce manufacturing time, by reciprocating a wire wrapping means in a specified direction and the direction opposite to the specified direction, while keeping a specified gap from a bobbin. SOLUTION: In a wiring equipment 10, a wiring 13 which stretches via a nozzle 32C is wrapped with a wire chuck 23. The wire chuck 23 and the nozzle 32C are moved in the direction (i.e., a Y-axis direction) approaching a bobbin 11, in the state that wire 13 between the wire chuck 23, and the nozzle 32C is positioned in an XZ-plane and an XY-plane. At the time of tying-up operation, the wire chuck 23 is reciprocated in an X-axis direction (i.e., the moving direction of the bobbin 11 at the time of tying-up operation) while keeping constantly a specified gap from the bobbin 11. Thereby manufacturing time can be greatly reduced. |