摘要 |
The invention relates to a process for installing process water conduits in a building, in which process the cold and hot water conduits 3, 4 are led from the distribution points 1, 2 for cold and hot water to the desired points of use. According to the invention, the water conduits 3, 4 are led to at least some of the points of use 1, 2 via cold areas of the building, such as the attic A, and are placed, at least within this region, in leak-tight, heat- insulating pipe protection ducts 5. <IMAGE>
|