发明名称 Software and event driven baseline correction
摘要 A correction system for correcting and maintaining the baseline offset signal value of a PMT channel of a scintillation detector at a predetermined value. The correction system utilizes an event driven mode wherein the correction is performed based on detected gamma interactions and this mode is utilized during periods of high count rate. Using the event driven correction mode, the system provides an output of far PMT channels based on a detected peak PMT channel. In a second mode, software driven correction, false triggers are inserted into the processing logic to initiate sampling of the baseline offset signal value and "simulate" gamma interactions. The false triggers are used by the system to perform baseline correction. The second mode is used during periods of lower count rate. Under both modes, the system effectively samples the baseline offset values from a channel that detects substantially no light energy to sample the baseline offset amount. This sampled value is averaged and compensated for against an ideal reference value, Vm. This is performed independently for each channel.
申请公布号 US5646408(A) 申请公布日期 1997.07.08
申请号 US19960756185 申请日期 1996.11.25
申请人 ADAC LABORATORIES 发明人 GOLDBERG, EDWARD M.;WELLNITZ, DONALD R.;NELLEMANN, PETER
分类号 G01T1/164;G01T1/17;G01T1/208;G01T1/40;(IPC1-7):G01T1/164 主分类号 G01T1/164
代理机构 代理人
主权项
地址