发明名称 CONSTRUCTION CONTROL METHOD
摘要 <p>PROBLEM TO BE SOLVED: To provide a construction method which makes it possible to form easily a fluidized soil with an excavated surplus soil and reduce greatly the construction cost. SOLUTION: A greater part of excavated surplus soil 7 excavated with an excavating machine 1 is piled up on both sides of an excavated ditch 6. Following the progress of the excavating machine 1, the reversed surface of a resin tube 3 is adapted to move forward, thereby securing a pipe route which inserts an embedded pipe. When the excavating machine 1 and the reversed surface of the resin tube 3 move forward for a certain distance, the excavated surplus soil pilled up on both side of the excavated ditch 6 is being dropped with a surplus soil drop mechanism 21 provided on a traveling truck 2 while solidified slurry is being provided and agitated. The excavated surplus soil is mixed with the solidified slurry in the excavated ditch 6, thereby forming fluidized soil 8.</p>
申请公布号 JPH09165746(A) 申请公布日期 1997.06.24
申请号 JP19950346968 申请日期 1995.12.14
申请人 JAPAN STEEL & TUBE CONSTR CO LTD 发明人 ICHIOKA YUJI;MATSUO ATSUSHI;ISHIHARA HIROSHI
分类号 E02F5/12;E02B9/06;E02D3/12;E02D17/12;E02F5/10;F16L1/024;F16L1/038;(IPC1-7):E02D17/12 主分类号 E02F5/12
代理机构 代理人
主权项
地址