发明名称 |
CONSTRUCTION CONTROL METHOD |
摘要 |
<p>PROBLEM TO BE SOLVED: To provide a construction method which makes it possible to form easily a fluidized soil with an excavated surplus soil and reduce greatly the construction cost. SOLUTION: A greater part of excavated surplus soil 7 excavated with an excavating machine 1 is piled up on both sides of an excavated ditch 6. Following the progress of the excavating machine 1, the reversed surface of a resin tube 3 is adapted to move forward, thereby securing a pipe route which inserts an embedded pipe. When the excavating machine 1 and the reversed surface of the resin tube 3 move forward for a certain distance, the excavated surplus soil pilled up on both side of the excavated ditch 6 is being dropped with a surplus soil drop mechanism 21 provided on a traveling truck 2 while solidified slurry is being provided and agitated. The excavated surplus soil is mixed with the solidified slurry in the excavated ditch 6, thereby forming fluidized soil 8.</p> |
申请公布号 |
JPH09165746(A) |
申请公布日期 |
1997.06.24 |
申请号 |
JP19950346968 |
申请日期 |
1995.12.14 |
申请人 |
JAPAN STEEL & TUBE CONSTR CO LTD |
发明人 |
ICHIOKA YUJI;MATSUO ATSUSHI;ISHIHARA HIROSHI |
分类号 |
E02F5/12;E02B9/06;E02D3/12;E02D17/12;E02F5/10;F16L1/024;F16L1/038;(IPC1-7):E02D17/12 |
主分类号 |
E02F5/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|