摘要 |
PROBLEM TO BE SOLVED: To flexibly and quickly level the load with a high precision to prevent the failure of a plan. SOLUTION: A scheduling engine 1 is provided with component assignment precedence data D1, component processing load data D3, processing capability adjustment precedence data D6, processing equipment/worker capability data D4, etc., as the input and arranges plural components by component assignment precedence and grouping division and assigns the processing load to components in order at the assignment interval designated in accordance with the appointed date of delivery of components or the start date of work and displays out schedule data Q1 and processing equipment/worker load data Q2 as the result. |