摘要 |
<p>PROBLEM TO BE SOLVED: To prevent the fall off or incomplete fitting of nuts which are to be fit in with an installation section from the opposite side of a fusible link installation section, in a terminal connection structure wherein the fusible link installation section is integrated with a relay box. SOLUTION: An installation section 19 where a fusible link 5 is to be installed is an integral part of a main body case 27 of a relay box 21. Nuts 7, 9 are inserted through insertion openings 36a, 36b into holding sections 33, 35 of the installation section 19, to be installed at specified positions. Under this condition, abutting pieces 37c, 39c formed in terminal sections 37a, 39a of bus bars 37, 39 are abutted against the lower parts of the nuts 7, 9.</p> |