发明名称 |
BACKFILLING TECHNIQUE FOR BURYING DITCH |
摘要 |
<p>PROBLEM TO BE SOLVED: To utilize residual soil by constructing bank bodies with a slurry and highly viscous fluidization treated soil comprising mainly residual soil and back filling a slurry and low viscous fluidization treated soil comprising mainly residual soil between the bank bodies. SOLUTION: A burying ditch 1 is excavated, and a buried matter 3 such as Hume pipe is laid down on a laid sand 2 formed at the bottom part of the burying ditch 1. Next a slurry and highly viscous fluidization treated soil comprising mainly residual soil is sprayed or deposited by a mold work method in the excavation advancing direction of the burying ditch 1 so as to construct a bank body 4. Also a slurry and low viscous fluidization treated soil as backfilling material 5 comprising residual soil is back filled in the burying ditch 1 divided by the bank bodies 4 and 4a. In this case, a buoyancy F generated on the buried matter 3 is cancelled by the self gravities W and W of the bank bodies 4 and 4a so as to stop their rise. The same procedure is repeated so as to bury the buried matter. Thus residual soil for construction can be utilized effectively.</p> |
申请公布号 |
JPH09125394(A) |
申请公布日期 |
1997.05.13 |
申请号 |
JP19950308401 |
申请日期 |
1995.11.01 |
申请人 |
PUB WORKS RES INST MINISTRY OF CONSTR;NIPPON KENSETSUGIYOU KEIEI KYOKAI |
发明人 |
MIKI HIROSHI;MORI NORIYUKI;KUNO GORO;TAKEDA KIHEE |
分类号 |
E02D17/12;E02B9/06;E02F5/10;F16L1/024;F16L1/038;(IPC1-7):E02D17/12 |
主分类号 |
E02D17/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|