发明名称 AIR CONDITIONING FACILITY
摘要 PROBLEM TO BE SOLVED: To enable an abnormal decreasing in temperature of cold water during a cooling operation or abnormal increasing in temperature of hot water during a heating operation to be prevented by a method wherein a control device for each of air conditioners is provided with a central monitoring device of an air conditioner for outputting an instruction to forcedly open a cold water or hot water valve. SOLUTION: A central monitoring device 9 for an air conditioner is connected to an air conditioner control device 7 for each of the air conditioners 4 through communication or the like. The air conditioners 4 are stopped in sequence and in the case that the air conditioner 4 being operated up to the last time is stopped, an instruction to make a forced opening of a cold water or hot water valve 6 is given to the predetermined air conditioner control device 7 from the central monitoring device 9 of the air conditioner, thereby the cold water or hot water valve 6 arranged for each of the air conditioners 4 is forcedly opened. With such an arrangement as above, the cold water or hot water can be circulated through a cold water or hot water pipe passage 3 at an air conditioning load including the air conditioners 4 and further it is possible to prevent an abnormal decreasing in temperature of cold water during cooling operation or to prevent an abnormal increasing in temperature of hot water during heating operation.
申请公布号 JPH09113008(A) 申请公布日期 1997.05.02
申请号 JP19950293415 申请日期 1995.10.17
申请人 EBARA CORP 发明人 IRIE KIICHI;FUJIMOTO MASAKAZU
分类号 F24F11/02;F25B15/00;(IPC1-7):F24F11/02 主分类号 F24F11/02
代理机构 代理人
主权项
地址