摘要 |
<p>PROBLEM TO BE SOLVED: To perform temporary suspension work quickly without flexing a cable when temporarily suspending a cable exposed from a concrete duct onto the beam laid on excavated ground. SOLUTION: This belt comprises a belt body 5 with a required width and a suspension belt 6 sewn together to both its ends, and an eye 10 for hooking is made by bending the suspension belt 6 loop form, and both ends of the suspension belt 6 are sewn together to the belt body 5, and the bolt body 5 is laid along the bottom of the cable 3, and the suspension belts 6 and 6 on both sides are pulled upward, and the hook 16 of the hanger 14 is hooked in the eye 10.</p> |