发明名称 SCHEDULING DEVICE
摘要 PROBLEM TO BE SOLVED: To easily plan a production schedule even for a production line for which the production schedule of a pre-process and the production schedule of a post-process depend on each other. SOLUTION: When the request of a production amount supplied from a production request preparation device 1 is received, this scheduling device 2 plans an optimum production schedule corresponding to the data of the various kinds of masters (an item number master, a calendar master, a numbered machine master and a season master) stored in a storage device 4 by an automatic planning part 5. At the time, the final production schedule is planned while adjusting the production schedule (pre-process) of a sub raw material required prior to the production of a product and the production schedule (post- process) of the product. For instance, when the production schedule of the pre- process is not suited to the production schedule of the post-process, the post- process is changed matched with the pre-process. Then, the final production schedule is displayed at a display device 6 by a prescribed format.
申请公布号 JPH0981633(A) 申请公布日期 1997.03.28
申请号 JP19950236719 申请日期 1995.09.14
申请人 SEKISUI CHEM CO LTD 发明人 KANEDA YASUHISA
分类号 B23Q41/08;B65G61/00;G05B19/418;G06Q50/00;G06Q50/04 主分类号 B23Q41/08
代理机构 代理人
主权项
地址