发明名称 AUTOMATIC BATH EQUIPMENT
摘要 <p>PROBLEM TO BE SOLVED: To eliminate false information of a gas meter on a leakage of gas by discontinuing a heat-restraining operation during a heat-retaining operation discontinuation time being equal to or longer than a reference time at every time when a prescribed interrupt time passes and by restarting the heat-retaining operation after the heat-retaining operation discontinuation time passes. SOLUTION: When a heat-retaining operation is started, a control device 16 sets an interrupt time, a heat-retaining pause time and a heat-retaining operation discontinuation time in timers making up an internal timer 22 respectively. The heat-retaining pause time determines a time interval for repeating reheat for retaining heat and it is set to be shorter than a reference time. The heat- retaining operation discontinuation time is a continuous time for discontinuing the heat-retaining operation forcibly for a while every time when the interrupt time passes and it is set to be equal to or longer than the reference time. Accordingly, false detection of a leakage of gas on the gas meter side can be prevented.</p>
申请公布号 JPH0972605(A) 申请公布日期 1997.03.18
申请号 JP19950228099 申请日期 1995.09.05
申请人 NORITZ CORP;OSAKA GAS CO LTD 发明人 KATAOKA HISATO;YANADA AKIHIRO;MURAKAMI MASAYOSHI;MATSUBARA TADASHI;KUBOYA MASAKANE;TSUGAWA AKIHISA
分类号 F24H1/00;(IPC1-7):F24H1/00 主分类号 F24H1/00
代理机构 代理人
主权项
地址