发明名称 Tubular pile driving method
摘要 A hollow pile (1) is driven into the ground (2) by vibration, etc. and at the same time, material is removed from the pile interior. The material is loosened hydraulically, using a high pressure fluid jet, and is then removed by an airlift device (4). A high pressure erosion device (3) is located in the hollow pile, and sunk together with it. The airlift device follows the erosion device, by executing a telescoping movement. The erosion device has a stator (5) and a rotor (6). The rotor has a tuyere connection with at least one radial erosion jet (7) and one annular bit (8).
申请公布号 DE19533281(A1) 申请公布日期 1997.03.13
申请号 DE19951033281 申请日期 1995.09.09
申请人 BILFINGER + BERGER BAUAKTIENGESELLSCHAFT, 68165 MANNHEIM, DE 发明人 GROSS, HANS-WALTER, 67459 BOEHL-IGGELHEIM, DE;RICKLEFS, JOERG, 22880 WEDEL, DE;PRIESKE, STEFFEN, 67117 LIMBURGERHOF, DE
分类号 E02D7/18;E02D7/26;E02D7/28;E02D13/08;(IPC1-7):E02D7/28 主分类号 E02D7/18
代理机构 代理人
主权项
地址