摘要 |
PROBLEM TO BE SOLVED: To reduce the number of vehicle to facilitate field operations by mounting a switch unit and a transformer unit on one vehicle, preliminary connecting together those units on the vehicle and mounting a transportable cubicle unit separately on one vehicle. SOLUTION: A switch unit 8 and a transformer unit 9 are mounted so as to be arranged in this order from the front to the rear on the load-carrying platform 7 of a truck 6, and the switch unit 8 and the transformer unit 9 are connected together by a conductor inside a conduit 11. A bushing 12 for connecting a transmission line to the switch unit 8 is projected on the front side of the truck 6. The workers go to the site by driving a truck 6 and another truck 6 on which a cubicle unit 10 is mounted, and the bushing 12 of the switch unit 8 is connected to the transmission line, the cubicle unit 10 is connected to a load, and the transformer unit 9 and the cubicle unit 10 are connected together with a cable 15. Therefore, the number of workers, the number of vehicles and the working time are reduced, so that the required cost may be reduced. |