发明名称 METHOD OF INSTALLATION CONSTRUCTION AND REMOVAL CONSTRUCTION OF ELEVATED ROAD
摘要 PROBLEM TO BE SOLVED: To reduce fieldworks. SOLUTION: A carriage 20, on which a unit 14 for a road is placed, is made to travel on an upper-layer side road 17a under a built state, and the unit 14 for the road is projected from the upper-layer side road 17a. One end side of the unit 14 for the road is placed on the lifting-lowering section 28 of a carriage 25 on a lower-layer side road 12, and the unit 14 for the road is further projected by making the carriage 25 travel and laterally moving the unit 14 by a lateral moving section 23. The other end side of the unit 14 for the road is put on the lifting-lowering section 28 of a carriage 26 on the lower-layer side road 12, the carriages 25, 26 are made to travel, and the unit for the road is lowered by bringing down the lifting-lowering sections 28 of the carriages 25, 26, and arranged between bearing sections 15.
申请公布号 JPH0953207(A) 申请公布日期 1997.02.25
申请号 JP19950208269 申请日期 1995.08.15
申请人 SANKYU INC 发明人 MIYAZONO SHOJI
分类号 E01D1/00;E01D2/00;E01D21/00;E01D101/26;(IPC1-7):E01D21/00 主分类号 E01D1/00
代理机构 代理人
主权项
地址