发明名称 WORK EXECUTION METHOD FOR WAREHOUSE FACILITY
摘要 <p>PROBLEM TO BE SOLVED: To dispense with welding work at a site and facilitate high lift work by assembling shelves and outer wall frame bodies to the floor side, constituting a roof body with bed portions and roof board portions, forming the beam portions at a factory, forming the roof board portions at the site, arranging the beam portions on the shelves, and connecting them with connecting tools. SOLUTION: Shelves 20 and outer wall frame bodies 32 are assembled, and beam portions 41 are assembled on the shelves 20. The beam portions 41 are formed at a factory and conveyed to a site in advance. Beams 42 are hoisted by a crane vehicle at the site then mounted on the upper ends of the stanchions 23 of the shelves 20. Connecting tools are operated between matched bolt holes, and the beam portions 41 are assembled on the shelves 20 with no welding work at the site. After the beam portions 41 are assembled, end sections of main house materials 51 are connected by suspension materials. Bent boards are arranged on roof board fitting metals, and adjacent edges are connected by bent connecting tools. Caps are inserted between adjacent edges, and roof board portions 50 are assembled.</p>
申请公布号 JPH0932297(A) 申请公布日期 1997.02.04
申请号 JP19950178302 申请日期 1995.07.14
申请人 DAIFUKU CO LTD 发明人 NARUSE MASAMORI
分类号 E04B2/56;B65G1/00;E04B7/02;E04B7/04;E04G21/14;E04H5/00;(IPC1-7):E04G21/14 主分类号 E04B2/56
代理机构 代理人
主权项
地址