发明名称 Method of installing a composite timber and concrete pile
摘要 A method for installing a composite timber and concrete piling system provides metallic tube that is partially filled with concrete. The unfilled portion of the metallic tube defines a splice member when the metallic tube is driven into a timber pile. The timber pile member is first driven into the earth at a selective position and at a selective orientation but a partial distance which leaves a small portion of the timber pile exposed above ground. The metallic tube is then placed on top of and aligned with the axis of the timber pile. The unfilled portion of the metallic tube forms a splice. The concrete filled metallic tube is forced downwardly until the unfilled portion of the tube is embedded into the exposed portion of the timber pile and wherein the concrete in the tube approaches the top of the timber pile. During driving, the concrete in the tube contacts the top of the timber pile.
申请公布号 US5593251(A) 申请公布日期 1997.01.14
申请号 US19930168424 申请日期 1993.12.17
申请人 GILLEN PILE DRIVING, INC. 发明人 GILLEN, GERARD
分类号 E02D5/48;(IPC1-7):E02D5/26 主分类号 E02D5/48
代理机构 代理人
主权项
地址
您可能感兴趣的专利