发明名称 Verfahren und Schaltungsanordnung zur Deckung von Energiespitzenbedarf bei elektrischen Wechselstrom- bzw. Drehstromnetzen
摘要 <p>A circuitry arrangement to cover peak energy demands in electric alternating or three-phase current networks is connected to a plurality of consumers (11). At least part of the consumers (11) are equipped with a stand-by current supply with a rectifier (15) fed by accumulators (13) and by the network (14). During short peak demands by the network (14), a fraction of the accumulator energy from the individual, decentralised stand-by supply networks (23) is fed into the network (14) as long as the peak demand lasts and the energy still available in the accumulator (13) is sufficient to ensure a stand-by current supply.</p>
申请公布号 DE19516838(A1) 申请公布日期 1996.11.14
申请号 DE1995116838 申请日期 1995.05.08
申请人 HAGEN BATTERIE AG, 59494 SOEST, DE 发明人 SCHERMANN, DIETOLF, 85375 NEUFAHRN, DE
分类号 H02J7/34;H02J3/32;H02J3/38;H02J9/00;H02J9/06;(IPC1-7):H02J3/28;H02J15/00 主分类号 H02J7/34
代理机构 代理人
主权项
地址