发明名称 |
Building-site trench-formation method with ground-water barrier |
摘要 |
The sealing trough (10) comprises a sole-plate (11) and lateral walls (12). Static supporting wall-sections are inserted in the trough near the bottom (23, 24), and the ground-water level is kept the same inside and outside the trough. The supporting wall-sections are secured by anchors (16) passing through the lateral walls (12) and into the ground (22) outside. Each supporting-wall section has an anchor attached at a point (25) above ground-water level. The holes (18) in the trough walls through which the anchors pass are sealed, while keeping ground-water level the same inside and outside the trough. The trench (20) is finally lifted out inside the supporting wall-sections (14), lowering the water-level inside it in the process.
|
申请公布号 |
DE19522150(C1) |
申请公布日期 |
1996.10.24 |
申请号 |
DE19951022150 |
申请日期 |
1995.06.19 |
申请人 |
BAUER SPEZIALTIEFBAU GMBH, 86529 SCHROBENHAUSEN, DE |
发明人 |
GOLLUB, PETER, 86529 SCHROBENHAUSEN, DE |
分类号 |
E02D19/00;(IPC1-7):E02D17/00 |
主分类号 |
E02D19/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|