发明名称 PROCESS FOR RUNNING A GAS AND STEAM TURBINE PLANT AND PLANT RUN BY THIS PROCESS
摘要 A gas and steam turbine plant has a waste heat steam generator (6) connected downstream of the gas turbine (2) at the waste gas side and having a high-pressure recuperator (48) connected to the water-steam circuit (8) of the steam turbine (4), which has a low-pressure part (4c). In order to achieve the highest possible efficiency of the installation, a heat exchanger (72) is arranged outside the waste heat steam generator (6). The primary inlet of the heat exchanger (72) is connected to the outlet of the high-pressure recuperator (48) and its primary outlet is connected to the inlet of the high-pressure recuperator (48), whereas its secondary side is connected to a transfer pipe (38) that opens into the low-pressure part (4c) of the steam turbine (4). In a corresponding process for running such a plant, the low-pressure steam (ND) that flows into the steam turbine (4) is overheated by indirect heat exchange with a partial stream (tS) of pre-heated feed-water (S) taken from the high-pressure recuperator (48).
申请公布号 WO9705366(A1) 申请公布日期 1997.02.13
申请号 WO1996DE01244 申请日期 1996.07.10
申请人 SIEMENS AKTIENGESELLSCHAFT;BRUECKNER, HERMANN;KOEHLER, GEORG 发明人 BRUECKNER, HERMANN;KOEHLER, GEORG
分类号 F01K23/10;(IPC1-7):F01K23/10 主分类号 F01K23/10
代理机构 代理人
主权项
地址