发明名称
摘要 <p>PURPOSE:To optimally control the completion of heating of an electric water heater to suit the usage pattern with ease of handling by desirably setting any time zone of main power supply by means of a power supply time zone setting means, and displacing the net power supply time zone to the second half of the main power supply time zone. CONSTITUTION:Upon turning on the power switch, the current time is set, and the main power supply starting time is then set, which is followed by setting the power supply stop time. When the main power supply starting time comes, the hot water consumption volume V is read and the heating completion temperature T computed, and then, the power source circuit is closed to start the power supply to a heat generator 2. The hot water temperature Tw in the hot water reservoir tank 1 is then measured by a temperature measuring means 3, and the measured value Tw is compared with the computation result T of the heating completion temperature. If Tw has reached T, the power source circuit is turned off, and the control is terminated. As clear from this description, the main power supply time zone for the heat generator can desirably set by a power supply time zone setting means, and the net power supply time zone can be displaced to the second half of the main power supply time zone by the computing means.</p>
申请公布号 JPH0830610(B2) 申请公布日期 1996.03.27
申请号 JP19880313676 申请日期 1988.12.14
申请人 MITSUBISHI ELECTRIC CORP 发明人 ITO YOSHIKAZU
分类号 F24H1/18;(IPC1-7):F24H1/18 主分类号 F24H1/18
代理机构 代理人
主权项
地址
您可能感兴趣的专利