发明名称 METHOD FOR SCHEDULING OF RESOURCE REQUEST
摘要 PURPOSE: To obtain a method for preparing schedule with high reliability, for facilitating a counter measure to a resource request. CONSTITUTION: A system 10 for scheduling a resource request for a resource provider prepares a first schedule based on the prescribed executing time of each resource request, and a second schedule based on the pessimistic executing time of each resource request. A user interface 16 simultaneously displays the first and second schedules for a system user. The first schedule allows the system user to operate the satisfactory total management of the resource provision. The second schedule allows the system user to operate time promise with a customer with high reliability. Thus, the schedule with high reliability for facilitating a counter measure to the resource request can be prepared.
申请公布号 JPH0830694(A) 申请公布日期 1996.02.02
申请号 JP19950052686 申请日期 1995.03.13
申请人 MINNESOTA MINING & MFG CO <3M> 发明人 JIYON EDOGAA KORINZU;ERIZABESU MARII SHISURII
分类号 B65G61/00;G06Q10/06 主分类号 B65G61/00
代理机构 代理人
主权项
地址