发明名称 WELL PRODUCTION OPTIMIZING SYSTEM
摘要 <p>A programmable system for controlling the operation of a plunger completion oil or gas production well to optimize production from the well. The controller operates one or more motor valves controlling the well in accordance with programmable values of off-time, on-time and exhaust-time. The controller monitors whether or not a plunger arrival signal is received on each cycle of intermitting the well and changes either the offtime or the exhaust-time for the next cycle in response thereto. In oil well mode, the off-time is decreased slightly for each cycle following a cycle in which plunger arrival occurred and increased slightly for each cycle following one in which it did not. In gas well mode, the exhaust-time is increased slightly for each cycle following a cycle in which plunger arrival occurred before on-time expired and decreased slightly for each cycle following one in which it did not.</p>
申请公布号 CA1338022(C) 申请公布日期 1996.01.30
申请号 CA19890609051 申请日期 1989.08.22
申请人 HALLIBURTON COMPANY 发明人 CROW, ROBERT W.;HOLLOMAN, RICKY M.;PRUDEN, JAMES B.
分类号 E21B43/12;(IPC1-7):G05D7/06 主分类号 E21B43/12
代理机构 代理人
主权项
地址