发明名称 PRIME ARRANGING FILLET CAP CONSTRUCTION METHOD
摘要 <p>PURPOSE:To prevent take fire to gas in a gas flow pipe at welding time without executing a nitrogen gas injecting process, by performing welding a fillet cap against a cut end part of the gas flow pipe in a condition that inside the gas flow pipe is exhausted further to seal an outflow of gas in the gas flow pipe by a heat resistant seal member. CONSTITUTION:In the case of fixedly welding a fillet cap 4 in the cut end part periphery of a steel pipe-made main pipe 1, a diffusion pipe 2 is connected to the main pipe 1, to insert a rubber ball 3 (3a, 3b) into the main pipe 1 from this diffusion pipe 2. In a condition that each rubber ball 3 is inflated to temporarily close the main pipe 1, a heat resistant seal member 11 is interposed between itself and a cut end face 1d, to fit a fillet cap 4 to the cut end part periphery. Next by using screw bars 8... and nuts 9... equally arranged in a circumferential direction relating to a fixe band 7 fixed to the cut end part periphery, the cap 4 is uniformly pressed to the cut end face 1d by a pressing plate 10. Thereafter, the temporarily closed condition by the rubber ball 3 is released to exhaust air in the pipe, and the cap 4 is welded to the main pipe 1.</p>
申请公布号 JPH0814471(A) 申请公布日期 1996.01.16
申请号 JP19940144643 申请日期 1994.06.27
申请人 TOKYO GAS CO LTD;NIPPON STEEL CORP 发明人 TAGUCHI YOSHIMITSU;OSHIMA AKIRA;KUMAGAI YOSHIHIRO;IGA SHUNICHI;TANAKA ISAO;SUZUKI SHOJI;MASAGUCHI YOUJI
分类号 F16L55/10;(IPC1-7):F16L55/10 主分类号 F16L55/10
代理机构 代理人
主权项
地址