发明名称 Prefabricated water meter installation for connection to public water supply
摘要 The installation consists of a rigid frame (1) with a stabilising base (6) and supports (8) for the distribution circuit (2). The distribution circuit comprises, in line, an upstream branch (12) connected to the supply network (3), a meter (17), a device of disconnection (15) and a downstream distribution connector (14) having a stop valve (13) able to be connected to a distribution pipe (4).A protective ice retarding cover (5) covers the frame and the distribution circuit. The protective cover has a device of locking (29) to the frame and device of selective access (31) from the outside to connect downstream of the distribution (14) and the stop valve. An evacuation tube (16) is located vertically under the disconnection (15) so that the upper opening (16') of the tube may be isolated (e) from the disconnection (15).
申请公布号 FR2719613(A1) 申请公布日期 1995.11.10
申请号 FR19940005440 申请日期 1994.05.04
申请人 SADE CIE GLE TRAVAUX HYDRAULIQUE 发明人 BONNO BERNARD;GARCIA ANDRE
分类号 E03B7/07;(IPC1-7):E03B7/04;E03B7/10 主分类号 E03B7/07
代理机构 代理人
主权项
地址