发明名称 PRODUCTION SIMULATION SYSTEM
摘要 PURPOSE:To verify model precision by performing simulation based upon the past. CONSTITUTION:An in-process data reproducing means 1 reproduces in-process data 9 on a line at specified of a specified day time from past production line result data 8 in a production management system 7. An input data reproducing means 2 extracts only the lot history of an input process from the line result data 8 by using the process name as a key to reproduce input data 10 after the specified time of the specified day. Then a simulation model generating means 3 generates simulation model data 13 corresponding to the input data format of a simulator on the basis of the in-process data 9, input data 10, master data 11 on the production line such as a process procedure and the number of facilities extracted from the production management system 7, and model input parameters 12 such as lot priority and facility operation data.
申请公布号 JPH07271759(A) 申请公布日期 1995.10.20
申请号 JP19940059649 申请日期 1994.03.30
申请人 NEC CORP 发明人 OOHASHI AKIHITO
分类号 G05B19/418;B65G61/00;G06F17/00;G06F19/00;G06Q50/00;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址