发明名称 |
PIPE JACKING METHOD OF DOUBLE-TUBE |
摘要 |
<p>PURPOSE:To reduce the construction period and cost, by simultaneously carrying out the jacking work and the auxiliary works like welding and non-breakage tests, on jacking a double-tube pipe to lay a pipe line. CONSTITUTION:A pushing ring 3 is attached to the front end of a basal pushing device 1 and a frame base 2 provided with a mounting member 4 loaded with a new double-tube A2 or the inner pipe 5b of double-tube A2 is fitted thereto. The pushing ring 3 is positioned to contact the outer pipe 6a of double-tube A1 to be thrusted and inner pipe 5b of double-tube A2 is arranged to contact the inner pipe 5a of double-tube A1. While jacking the double-tube A1, the joining part of the inner pipes 5a, 5b are welded and the auxiliary works are executed immediately after the welding.</p> |
申请公布号 |
JPH07224593(A) |
申请公布日期 |
1995.08.22 |
申请号 |
JP19940016147 |
申请日期 |
1994.02.10 |
申请人 |
TOKYO GAS CO LTD;ISEKI TORY TECH INC |
发明人 |
HAYASHI MITSUTOSHI;NAGASHIMA SHINGO;KURASHINA MINORU;IYAMA MAKOTO;UNO HIDEKI;SATO TORU |
分类号 |
E02B9/06;E02F5/10;E21D9/06;F16L1/024;F16L1/038;(IPC1-7):E21D9/06 |
主分类号 |
E02B9/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|