发明名称 Integrated column and pile
摘要 An integral combination of column and pile for use in building structures in a sandy soil. The method of formation is to provide a ground situs of suitable depth and width formed preferably by an hydraulic-powered auger. The situs is then filled with a cementitious slurry. A reinforced precast concrete column is provided having reinforcing bars extending a substantial length out of its bottom. The exposed bars are inserted into the slurry until the column merges with the slurry. Upon the hardening of the slurry, the result is an integral column and pile set into the ground.
申请公布号 US5429455(A) 申请公布日期 1995.07.04
申请号 US19930082556 申请日期 1993.06.28
申请人 STATE PAVING CORPORATION 发明人 BONE, MICHAEL C.
分类号 E02D5/50;(IPC1-7):E02D5/30 主分类号 E02D5/50
代理机构 代理人
主权项
地址