摘要 |
PURPOSE:To provide a process schedule management system capable of immediately judging the change point of a layout image without influencing an old layout even when the additional change of an operation is generated, in the process schedule management system capable of both data conversion between a part drawing and a Gantt chart. CONSTITUTION:This system is provided wish a Gantt chart preparation and display function 16, a Gantt chart/part drawing conversion function 17, a part drawing preparation and display function 18 and a part drawing/Gantt chart conversion function 19. In the case of performing the additional change of the operation, by utilizing the layout prepared previously and specifying and properly using manual conversion, automatic successive conversion or automatic batch conversion by a user, the easily usable part drawing and Gantt chart for which the layout is not changed completely and the additional change point of the operation is easily judged compared to the previous layout, are prepared. |