摘要 |
This process, in accordance with which prefabricated elements for constructing structural parts which are intended themselves to be positioned end-to-end in order to construct the structure in question are coupled together continuously, consists in using elements 6 provided with solid coupling means 20 which project from their walls and are aligned with one another when the structural parts 4 are arranged end-to-end, at least one strong longitudinal element 21 which rests on said coupling means 20 is positioned and then the assembly formed by the coupling elements 20 and the longitudinal element 21 is inundated with the poured concrete 26. <IMAGE>
|