摘要 |
<p>PURPOSE:To form a correct diagram in the case of traveling of trains with the lower rank display of each signal such as in the case of a high density diagram, by forming the operation curve for each succeeding train, repeating the calculation for forming the operation curve for the succeeding train in consideration of the signal display. CONSTITUTION:A simulation part 11 which receives the fundamental data for diagram formation such as the on-ground condition, on-vehicle condition, signal condition, train operation interval, and stop time from input parts 1, 2, and 3 forms an operation curve for a preceding train in an operation curve formation part 111c, and calculates the succeeding signal display development due to the traveling of the preceding train from the operation curve in a signal display development calculation part 12, and further, the operation curve of the succeeding train is formed on the basis of the signal display development, and the train diagram is formed through the repetition of the above-described calculations.</p> |