A mining system for removing overburden from a valuable mineral or coal deposit from a pit (9) is disclosed. The mining system comprises a dragline for removing overburden from a high wall side (3) of the pit (9) to produce a properly formed high wall face. The mining system further comprises a cross-pit transport assembly which comprises a cross-pit vehicle (13) for dislodging and transporting overburden that is located between the high wall side (3) and a low wall side (7) of the pit (9) towards the low wall side (7).