摘要 |
The method for effectively laying a sheet pile under the ground, is composed of injecting water under a pressure through a pipe (20) for laying the sheet pile (10) under the ground (1); injecting grout containing cement, bentonite, water glass through the tube (20) for forming grout layer (2) around the sheet pile (10). The method enables to shorten the time and cost of the construction by omitting the hole-drilling process.
|