发明名称 |
Method for producing or renewing a side path running along a railway embankment |
摘要 |
In order to prevent the lateral breakaway of the injection lances (1) serving for the anchorage of a side path (R) running along the railway embankment, said injection lances are interconnected by wire ropes (3). After attaching a top beam (7) which is supported on pipe clamps (6), the region below is covered by means of a shuttering grid (8), against which a nonwoven (9) is laid on the track side. The method secures the side path, and hence also the adjoining railway track installation, against lateral collapse-type breakaway and additionally permits uncomplicated and cost-saving realisation, as well as unhindered water drainage. <IMAGE>
|
申请公布号 |
DE4429248(A1) |
申请公布日期 |
1995.03.02 |
申请号 |
DE19944429248 |
申请日期 |
1994.08.18 |
申请人 |
CLAUS, HERMANN, VILTERS, CH |
发明人 |
CLAUS, HERMANN, VILTERS, CH |
分类号 |
E01B2/00;E01C3/04;E02D29/02;(IPC1-7):E01C3/04;E01C15/00;E02D17/20 |
主分类号 |
E01B2/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|