发明名称 LINING PIPE PRODUCTION SIMULATION SYSTEM
摘要 PURPOSE:To enable the evaluation and verification of a total production system from material supply to product delivery by executing feed-back with the output result of a production line simulation as input data. CONSTITUTION:This system is provided with a pipe forming process simulation part 3 which generates various kinds of data files such as variation kinds of inventory volumes by physical distribution lodgements daily kind-classified inventory volumes, etc., by inputting the daily order-accepting data, line capacity data, delivery lead time, etc., based on a production scheduling, a resin tube supply process simulation part 1 which generates the inventory volumes file of a resin pipe with output data of the pipe forming process simulation part 3 as an input and a pickling process simulation part 2 which generates and outputs the respective files such as the working ratio of a crane for carrying a steel tube, the occupancy ratio of a pickling tank or the like by inputting the output data of the pipe forming process simulation part 3.
申请公布号 JPH0721268(A) 申请公布日期 1995.01.24
申请号 JP19930146202 申请日期 1993.06.17
申请人 SEKISUI CHEM CO LTD 发明人 HARA YUJI
分类号 B23Q41/08;B65G61/00;G05B17/00;G05B19/418;G06F19/00;G06Q50/00;G06Q50/04 主分类号 B23Q41/08
代理机构 代理人
主权项
地址