摘要 |
<p>PROBLEM TO BE SOLVED: To efficiently draw up schedules for a plurality of mutually different tests. SOLUTION: On the basis of given conditions, a period part indicating the time required for each test item, a process part indicating the process for each test item, a test template indicating the execution schedule for the process part and the schedule for the whole of a preclinical test are sequentially produced with a period part producing part 20, a process part producing part 30 and a test template producing part 70 respectively. In addition, the produced test template is stored in a test template file 50, and, if there is a test template that can be used for the test under the given conditions among the stored test templates, a test template retrieval part 60 retrieves the test template, and schedule of the whole of the preclinical test is produced.</p> |