发明名称 TUNNEL TIMBERING METHOD
摘要 The construction method minimizes the tunnel deformation by coupling circular steel supprts in a digging direction by the subsidence prevention beams connectable in a line. The construction method comprises the steps of: excavating the upper part of the tunnel by a predefined length; connecting a plurality of circular supports (2) to beam support plates (8) with bolts (12); connecting one beam (1) to another beam (1) with bolts (11) over the floor of the upper part of the tunnel; excavating the lower part of the tunnel by a predefined length; connecting a plurality of circular supports (2') to beam support plates (8') with bolts.
申请公布号 KR940011420(B1) 申请公布日期 1994.12.15
申请号 KR19920007419 申请日期 1992.05.01
申请人 SAM BO GEOLOGICAL CO., LTD. 发明人 KANG, BYONG - SAN
分类号 E21D11/00;(IPC1-7):E21D11/00 主分类号 E21D11/00
代理机构 代理人
主权项
地址