摘要 |
<p>PCT No. PCT/FR91/00263 Sec. 371 Date Jan. 23, 1992 Sec. 102(e) Date Jan. 23, 1992 PCT Filed Apr. 2, 1991 PCT Pub. No. WO91/15696 PCT Pub. Date Oct. 17, 1991.A process for laying flexible conduits on an ocean floor by continuous unrolling of the conduit at a laying site from at least one supply ship to a laying ship, wherein the flexible conduit is gradually transferred from the supply ship to a storage means located on the laying ship.</p> |