摘要 |
<p>PURPOSE:To improve the reduction of system throughput or on-line response caused by the adverse load balance of the amount of used system resources due to the schedule of a conventional job schedule system. CONSTITUTION:Each time a job is finished, the amount of used system resources using a job name as a key is stored in a system resource use history table 2 by a system resource used amount memory preserving means 1. When a job is started, at the time point, a starting job selecting means 5 measures the amount of used system resources and selects any job in a job start waiting queue 4 to use the system resources which do not reach separately set high load conditions. At such a time, the jobs of the job start waiting queue 4 are searched while referring to the system resource use history table 2.</p> |