摘要 |
PURPOSE:To perform efficient scheduling even in the state of the frequent occurrence of the difference of an actual processing time from a processing forecasted time by predetermining the processing order based on an inputted predeterminate processing time. CONSTITUTION:Sheduling is performed based on data of processing contents 2 of processes, processing capabilities 1 of processes, a process processing order 3, and the actual progress condition, and the result is outputted as processing instructions collectively or for each process. With respect to a special process whose actual processing time is different from the forecasted time, the processing predeterminate time is preliminarily inputted to a scheduler before the processing of the special process, and scheduling is performed in consideration of this time. The actual processing progress is periodically monitored to repeat scheduling. Thus, the process flow is efficiently terminated in a shorter time, and the confusion due to a large deviation between the schedule and the actual flow is not brought about. |