摘要 |
PURPOSE:To prevent uneven loading for massive transport by determining the lot arrangement of an inter-building transport carriage and a carriage stacking position, taking into consideration stacking order, uneven loading and the like so as to prevent generation of the dead angle of a crane. CONSTITUTION:Temporary allotment is carried out by referring to a stacking condition table 7 and a stacking pattern table 8 for an inter-building transport resources file 6. Inversion of a stacking position is carried out in the stacking order, referring to a stacking order operation table 9. Stacking command is performed in priority from a point at a dead angle when viewed from the driver' s seat of a crane. After correcting the stacking position, referring to an uneven loading check table 10 and carrying out arrangement with its gravity centered, it is judged whether uneven loading occurs. When no uneven loading exists, the lot arrangement of an inter-building transport carriage and a stacking position on the carriage are determined by a computing means 11, and are displayed on a crane terminal device 3 as an operation guide from a crane work command means 12. |