摘要 |
<p>PURPOSE:To speedily generate a job instruction in which work is allocated from a production management system to a work alteration indication by adjusting the tact of a production line to the tact of shortest time and automatically generating the work indication document improving production efficiency. CONSTITUTION:A line host control part 5 reads data written into a communication storage unit transmitted to assembly places S1 and test places 2 through line terminal equipments 3, and the job instruction is outputted to the assembly places 1 and the test places 2 by the display devices of the line terminal equipments 3 through the line terminal equipments 3. The line host control part 5 previously stores the respective files of a work content, a worker, a time change, a standard flow order, the components of a product and equipment tools, receives the production instruction from the production management system, the operation of work allocation when the tact is set to be the minimum and a line balance loss in the production line is set to be the minimum is executed and the process sheet is outputted to a prescribed workshop through the line terminal units 3.</p> |