摘要 |
<p>Sticking of drilling pipe can be reduced by imparting vibrational energy to it, by connecting it to a Coanda switched vortex valve (CSV), and pumping fluid, such as drilling mud or completion fluid, through the CSV and pipe, with the fluid oscillating between high and low states in the CSV to create a fluid hammer effect to impart vibration to the pipe.</p> |